Ultrasonic Inspection Services

UT Thickness Gauging and

Corrosion Mapping

Measure remaining wall thickness and document metal loss in suitable pipes, vessels, tanks and components to support maintenance and integrity decisions.

Inspection Snapshot

Practical measurements for metal loss assessment

Thickness Gauging

Measure wall thickness at identified locations.

Corrosion Mapping

Build a thickness profile over an agreed survey area.

Repeat Monitoring

Compare consistent locations across inspection intervals.

Discuss your inspection

Certified Personnel

Qualified NDT professionals

Fast Turnaround

Responsive scheduling

Modern Equipment

Calibrated UT instruments

Detailed Reports

Clear inspection findings

UT Thickness Gauging and Corrosion Mapping

Component preservation

Assess wall thickness without cutting the component. Surface cleaning, coating removal or insulation removal may still be necessary.

accent line What are UT thickness gauging and corrosion mapping

Measure the remaining metal at defined locations

Ultrasonic thickness gauging measures the travel time of sound through a material to calculate its thickness. It usually requires access to one surface. Corrosion mapping collects readings over a defined grid or scan area to show thickness variation. A manual grid and an encoded ultrasonic map provide different coverage; the survey method and resolution must be specified. Individual readings do not establish the condition of unexamined areas.

Remaining wall thickness

Corrosion surveys

Erosion monitoring

Thickness grids

Baseline surveys

Repeat inspections

--------- Our Process ---------

A traceable survey from location marking to report

Scope Review

Identify the component, expected thickness range, material, damage concern, operating temperature and accessible areas. Agree survey spacing and reporting requirements.

Arrow

Preparation and Calibration

Review coatings and surface condition. Select a suitable probe and verify the instrument using appropriate reference thicknesses and material velocity.

Arrow

Measurement and Mapping

Collect readings at marked locations or along agreed scan paths. Investigate questionable signals and document areas where reliable measurements cannot be obtained.

Arrow

Evaluation and Report

Report measured thicknesses, observed minima within the examined coverage and limitations. Compare with owner-supplied limits when this evaluation is included.

--------- Inspection capabilities ---------

Thickness surveys for industrial equipment

The survey is tailored to the expected damage pattern. More closely spaced readings or scanning may be required where localized thinning is a concern.

Piping Surveys

Measure selected straight runs, low points and other locations identified by the inspection plan.

Elbows and Reducers

Examine accessible areas where flow conditions may contribute to erosion or localized metal loss.

Vessels and Tanks

Collect thickness readings on suitable shells, heads and accessible plate areas.

Grid Based Corrosion Maps

Record measurements against a defined grid to show wall thickness variation across the survey area.

Repeat Monitoring

Return to documented locations to support meaningful comparison with previous compatible readings.

Fabrication Thickness Checks

Check accessible material thickness against drawings or specified limits where the measurement method is appropriate.

--------- Discontinuities and Findings ---------

What a thickness survey can identify

A coarse grid may miss isolated pits. Reliable thickness readings alone do not identify the damage mechanism, prove leak tightness or establish remaining service life.

Reduced wall thickness

General metal loss

Localized thinning

Erosion patterns

Thickness variation

Changes from a previous compatible survey

--------- Codes & standards ---------

Inspection aligned with your requirements
Thickness measurement is one input to an integrity assessment. Minimum required thickness, corrosion rates, inspection intervals and fitness for service require the applicable engineering basis and defined responsibilities.

ASTM E797/E797M

Manual ultrasonic pulse-echo contact thickness measurement.

ASME Section V

Applicable ultrasonic procedure requirements when invoked.

API 570

Inspection context for in-service piping, where specified.

API 510

Inspection context for pressure vessels, where specified.

API 653

Inspection context for storage tanks, where specified.

Owner procedures

Survey spacing, reference locations and assessment limits.

--------- Industries served ---------

Supporting quality and asset integrity

accent line

What our clients say

accent line
Posted on Google Google
Paul Herman profile picture
Paul Herman
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Thank you for the quick service and the complete report. Best wishes Paul Herman Firwin Corp
Posted on Google Google
Jon Himelfarb profile picture
Jon Himelfarb
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great service, above and beyond what was asked for or expected. CMH Metlabs expedited their internal processes to meet an urgent request and helped us meet our deadlines. 100% would recommend them.
Posted on Google Google
Mark Nowakowski profile picture
Mark Nowakowski
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Thank you CMH METLABS for your attention, professionalism and responsive communication. This includes your extra follow-up to confirm the lab test results. We were able to continue our business with minimal delay thanks to your efforts!
Posted on Google Google
George Berton profile picture
George Berton
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Very co operative with information and timing.
Posted on Google Google
ahmadreza asefi profile picture
ahmadreza asefi
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The professional team, the good testing equipment, the short turnaround time, and the comprehensive reporting have all made us extremely satisfied with this laboratory. We will certainly return to them for future testing needs.
Posted on Google Google
Etienne Fortier profile picture
Etienne Fortier
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Submitted metal sampled for testing, obtained test results promptly and professionally. Highly Recommended.
Posted on Google Google
Sanjay Sharma profile picture
Sanjay Sharma
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Birla Carbon Hamilton worked with CMH for testing their boiler tube . CMH Metlabs issued a report for their testing. The report was good and covered all technical requirements. We will work with them in future.
Posted on Google Google
Don Webster profile picture
Don Webster
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
CMH Metlabs did a number of chemical analysis for us over the last few weeks. The prices are good and the turn-around time was excellent. We needed some clarity on the results from the tests. The technical people at CMH responded quicky and our questions were answered. We discovered a couple of typos in the reports but it did not affect the over all accuracy of the report. We are looking forward to continuing our analyses with CMH.

Frequently asked questions

Answers before you schedule

Share the component type, material, dimensions, inspection location, drawings and applicable standard so we can recommend the correct UT approach.
Can you measure through paint or coatings
Sometimes. Suitable echo-to-echo or coating compensation techniques can exclude certain coatings, but performance depends on coating condition, metal thickness and echo quality. Coating removal may be necessary.
No. Detection depends on probe characteristics, survey spacing, scan coverage, surface condition and pit geometry. The inspection plan must reflect the smallest damage feature of concern.
Conventional contact UT needs access to the component surface. Insulation removal or suitable access windows are normally required. Thickness checks at windows do not establish the condition beneath all remaining insulation.
Readings provide current thickness at examined locations. A remaining-life calculation also needs suitable historical data, a defensible corrosion rate, required thickness and an engineering assessment.
It may be possible where process conditions, temperature and access are suitable. Hot surfaces require an appropriate procedure and equipment, and site safety arrangements must be confirmed.

--------- Need an inspection? ---------

Build a clear record of remaining wall thickness

Send the equipment details, areas of concern and previous readings so we can review an appropriate thickness survey.
accent line Contact CMH NDT Services

Plan your inspection

Share your project scope so we can confirm method suitability, availability, access and reporting arrangements.

Tell us about your job

Fields marked * are required. We reply within one business day.
By submitting this form, you agree to be contacted about your inspection request.